Beijing Tianyihongda Science & Technology Development Co., LTD

Sincerity Is Fundamental, Clients Is The First. Strict Quality Control, Earnest Service Supply.

Manufacturer from China
Site Member
7 Years
Home / Products / Power Distribution Terminal /

Strong Stability Power Distribution Terminal For Overhead Line Zero Sequence Reclosing

Contact Now
Beijing Tianyihongda Science & Technology Development Co., LTD
City:beijing
Province/State:beijing
Country/Region:china
Contact Now

Strong Stability Power Distribution Terminal For Overhead Line Zero Sequence Reclosing

Ask Latest Price
Video Channel
Brand Name :Tianyihongda
Model Number :TYHD-FTU6
Certification :type test report
Place of Origin :Beijing,China
MOQ :1set(3pcs)
Price :Negotiation
Payment Terms :L/C, T/T, Western Union
Supply Ability :1000 sets per month
Delivery Time :within 3-5 working days
Packaging Details :standard export package
3I>Curve Select :0-5;0:OFF 1:three section of three-section protection 2:IEC SI 3:IEC LTI 4:IEC EI
3I> Amp :0.010-10*In;Setting the three section of three-section protection
3I> Time :0.00-600.00S;Time delay for export
O->I Switching :ON/OFF; Enter or exit of zero-sequence reclosing function, ON as enter, OFF as exit
Open time :0.10-600.00S O->I Lockout Opening time
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description
Length of cable at switch load side (m) 50 100 150 200 250 300 350 400 450
Length of overhead line at switch load side (m) <1000 <4000
Fixed value (A) 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0
Length of cable at switch load side (m) 480 500 550 600 650 700 750 800 850 900
Fixed value (A) 2.2 2.4 2.6 2.8 3.0 3.2 3.4 3.6 3.8 4.0

Calculation formula for fixed values: Fixed value of current =1.5×3×(S1×L1+S2×L2)

L1 is the total length of overhead line at boundary switch load side. S1 is the empirical value of capacitive current of overhead line per km per phase. The recommended value is 0.02A/km.

L2 is the total length of cable at boundary switch load side. S2 is the empirical value of capacitive current of cable per km per phase. The recommended value is 1A/km.

Choose 1S when the neutral point is not earthed or earthed by arc suppression coil. Choose OS or lower when the neutral point is earthed by low resistance.

The calculation of fixed values for zero-sequence protection current only depends on the direct earth capacitance of cable or overhead line at switch load side. The table above is the results of approximate amount multiplied by safety factor. Users can calculate personally according to the actual condition of the line at switch load side. If there are both cable and overhead line at switch load side, add their direct earth capacitances together. The safety factor shall be chosen between 1.5~3 (It is recommended that a larger safety factor shall be chosen when the fixed value is relatively small, while a smaller one shall be chosen when the fixed value is relatively large.)

Enter Main Menu

When the system is idle, press “VIEW” to enter the main menu

After entering the main menu, press “ESC” to exit to idle status.

Switching of Menu Content

After entering the main menu, press “ENT” to select the content, press “” or “” to switch the content, and press “VIEW” to enter corresponding menu.

Press “ESC” to exit to idle status.

Modifying Fixed Value

After entering fixed value interface, press “ENT” to confirm the fixed value item and press “ENT” again to confirm the modification of fixed value. Press number buttons “0” to “9” to input the fixed value parameters. Press “” or “” to change the data position and press “SET” to save the fixed value (Press “ESC” to give up the modification and the fixed value after modification will not be saved).

After entering fixed value interface, press “” or “” to switch the fixed value interfaces.

After entering fixed value interface, press “ESC” to exit to the main menu.

Inquiry Cart 0